17 Steps for the Placement of Rubber Dam are:
General rule for limited isolation is to include one tooth posterior and two teeth anterior to the tooth being operated.
Steps for placement of rubber dam are:
1. Testing and lubricating the proximal contacts.
ADVERTISEMENTS:
2. Punching the holes.
3. Lubricating the dam.
4. Selecting the retainer.
5. Testing the retainers.
ADVERTISEMENTS:
6. Positioning the dam over the retainer.
7. Applying the napkin.
8. Positioning the napkin.
9. Attaching the frame.
ADVERTISEMENTS:
10. Attaching the neck strap.
11. Passing the dam through posterior contact.
12. Applying compound.
13. Applying the anterior anchor.
ADVERTISEMENTS:
14. Passing the septa through the contacts.
15. Confirming a properly applied rubber dam.
16. Checking access and visibility.
17. Inserting the wedges.